construction rebar used thread rolling machine
Designed for processing parallel threads for rebar mechanical connection in construction. It can process HRB335, HRB400 and HRB500 hot rolled ribbed reinforced bar with diameter 12-50mm.
Production Information:
1. The thread form is full and the size is precise;
2.Rolling wheel has long service period, low additive cost of connector;
3.Peel the rebar rib and process thread on rebar end can be made in one step;
4. High production efficiency, it can make 800-1000pcs every day/one machine;
5.It can process rebar of HRB335, HRB400 and HRB500 with diameter from 12-50mm;
6. One handpiece to process left-handed and right-handed thread, which is quite easy to operate and maintain. The cutting tool can be
replaced within only 3-5 minutes;
7. The screw thread diameter are the same which makes it easy to handle and splicing quality is stable and reliable.
Machine Spare Parts:
1. Roller (one set has three pieces);
2. Blade(one set has four pieces);
3. Eccentric Shaft(one set has three pieces);
4.Cooper Bush.
Remarks:
1. Roller Thread Pitch (p=mm) and Rebar Specification ;
p=2/p=2.5 Φ12-Φ22
p=2.5/p=3 Φ25-Φ32
p=3/p=3.5 Φ36-Φ40
2. 60°, 75°thread angle free to chose;
3. Rollers Dimension and the color of machine could be customized by your request.
Model JBG-40CI Rebar Diameter 16-40mm Motor Power 4.0KW Voltage 3-380V 50Hz Spindle Speed 49-62r/min Max Thread Length 65mm Max Output Torque 350KN Cooling Pump Power 40W Weight 375kg Dimension 1250*700*1040mm
Packing & shipping
Customer Photo
Certificates
FAQ
1. What is the processing speed of Rebar Thread Rolling Machine?
The processing speed depends on many factors, such as the worker's proficiency, rebar grade, rebar diameter, thread pitch and thread length,etc. For example, if processing 60mm thread length on 25mm diameter rebar, it will need 30-40 seconds. If you need high speed machine, we can adjust motor ratio within certain limits.
2. What are the consumable spare parts? What is the service life of spare parts?
Commonly used spare parts are roller and cutting blade. Usually after 1000-3000pcs rebar threads, the roller and cutting blade will wear out.
3.What is the warranty of your machine?
Machine warranty is 6 months. During the guarantee period, if any quality problems occur, we will provide the related spare parts(consumable spare parts not included)free of charge.
4.Can the motor voltage and machine color be changed?
Yes, we can change the motor according to the voltage requirement in your country. Machine colors can also be changed according to your preference.
Product Categories : Rebar Thread Rolling Machine > JBG Series Rebar Thread Rolling Machine
Electric Motor Driven Steel Rod Splicing Parallel Thread Rolling Machine used in Construction
Rebar parallel thread rolling machine for 14-40mm
Rebar thread rolling machine for diameter 16-40mm
Rebar Rib-peeling and Parallel Thread Rolling Machine JBG-50
300mm Thread Length Rolling Making Machine
high speed steel thread rolling machine
JBG-40F used thread rolling machine
Rebar parallel thread rolling screw making machine